Maintenance Checklist; Measures To Be Taken Before The Servicing; Measures To Be Taken After The Service - Bernina B 590 Service And Maintenance Manual

Table of Contents

Advertisement

9.5 Maintenance checklist

The Maintenance Checklist explains what work is to be carried out after the maintenance messages are
displayed.
Note:
The Maintenance Checklist refers to maintenance work only (cleaning, lubrication, visual and functional
checks) and not to repairs (excluded owing to their complexity).
The parts whose replacement is recommended after the display of the tenth maintenance interval are listed
in the Wear-and-Tear-Parts Definition.
The Service and Maintenance Manual and the service and technical information notices serve as a basis for
the service work to be carried out.
The service works listed in the Maintenance Checklist must be carried out in the order listed, at each
maintenance interval.

9.5.1 Measures to be taken before the servicing

Note:
To use the Service Program, the machine must be running (switched on). Refer to the safety
instructions, please.
• Customer data must be saved each time before maintenance or repair work is carried out.
• Update the machine to the latest firmware.
• Read out the stitch and hour counter and enter on the Service Report.
Customer data backup in Service Program 1g of the BERNINA 590, 570 QE, 540, 535, 500.
Connect BERNINA USB data stick and select required button. Remove stick after confirmation by the
machine.
• Save the customer settings = Customer data
saved onto the storage medium
• Load the customer settings = Customer data
loaded into the sewing and embroidery
system.

9.5.2 Measures to be taken after the service

• Loading of the customer data into the
sewing and embroidery system = Load the
customer settings.
• Maintenance- and cleaning-stitches reset, service entry in the Service Program.
Recommended:
Create a Service Report and save in a customer database, or file a copy.
Furthermore, the following data should be noted in the Service Report.
Customer and machine data, standard accessories (supplied with the machine), stitch and hour counter,
report number, service interval, complaint, work carried out, time and material input, date next service due,
name of technician.
BERNINA International AG
Seestrasse 161
CH-8266 Steckborn
DRAFT – VERSION
Schweiz
Seite 168 von 172

Advertisement

Table of Contents
loading

This manual is also suitable for:

B 500B 570B 540B 535

Table of Contents