Note:
After the measuring, sock up the solder of TP.
* :
PC Setting
() is required beforehand.
The connection of adjustment equipment are as shown in
15.2. Adjustment Standard (Base Unit)
When connecting the Simulator Equipments for checking, please refer to below.
15.2.1. Component View
Note:
(H) - (O) is refered to
15.2.2. Flow Solder Side View
Note:
(A) - (P) is refered to
15.3. Adjustment (Charger Unit)
Items
(A) Charging Check
Note:
After the measuring, sock up the solder of TP.
The connection of adjustment equipment are as shown in
15.4. Adjustment Standard (Charger Unit)
When connecting the Simulator Equipments for checking, please refer to below.
15.4.1. Flow Solder Side View
Note:
(A) is refered to
ADJUSTMENTS (BASE UNIT AND CHARGER UNIT)
ADJUSTMENTS (BASE UNIT AND CHARGER UNIT)
ADJUSTMENTS (BASE UNIT AND CHARGER UNIT)
Adjustment
Point
1. Connect Charge Contact 12
-
2. Measure and confirm voltage across the regigster is 2.7V ± 0.2V.
Adjustment Standard (Base Unit)
Procedure
/2W register between charge+ and charge-.
Adjustment Standard (Charger Unit)
55
()
()
()
().
Check
().