Baxi MAIN Combi 30 HE Installation & Service Instructions Manual page 31

Hide thumbs Also See for MAIN Combi 30 HE:
Table of Contents

Advertisement

Control Box Cover
Fig. 41
Fig. 42
Cable Clamp
Fuse
Fused supply 3A
Always fit fast
230V ~ 50Hz
blow 2A fuse
Live (brown)
Neutral (blue)
Earth (green/yellow)
1
230V
2
Terminal Block
L
External
230 V
Controls
br
Selector /
b
Reset Switch
bk
bk
Key to Wiring
b - blue
br - brown
bk - black
r - red
g - green
Fig. 44
© Baxi Heating UK Ltd 2009
Frost Thermostat
L
N
External Clock
N
br
b
g/y
Room Thermostat
bk
IMPORTANT: If an integral timer is fitted to the boiler
bk
an external frost thermostat wired as shown will not
operate correctly. Only external timers may be used in
such installations, as in the diagram.
Fig. 43
Functional Flow Diagram
br
br
br
b
b
r
b
r
r
g
g
PCB
bk
bk
b
br
bk
r
r
g
g
Fig. 40
Facia Panel
br
L
b
N
g/y
bk
1
230 V
bk
2
SL
Pump
b
N
bk
b
Pressure Switch
br
Fan
b
N
Flue Thermostat
Safety Overheat Thermostat
Central Heating
NTC Sensor
DHW
NTC Sensor
Gas Valve Modulator
Spark Electrode
Gas Valve
Condensate Trap
Flame Sensing Electrode
Hydraulic Differential Pressure Switch
DHW Flow Priority Microswitch
10.0 Installation
10.8
Making The Electrical Connections
To connect the mains input cable proceed as follows:-
1. Slacken the facia securing screws and lift the
outercase panel so that its locating tabs are clear of the
facia. Remove the panel.
2. Completely undo the screws securing the facia panel
and hinge it down (Fig. 40).
3. Remove the control box cover securing screws.
Disengage the barbs on the control box from the
cover. Remove the cover (Fig. 41).
4. Slacken the cable clamp on the LH side of the boiler
chassis (Fig. 42). Insert the cable through the clamp and
route it to the terminal block.
5. Slacken the screws in the terminal block, connect
the input cable, and tighten the screws.
6. If an external control is to be connected it can be
done at this point. Run the input cable from the
external control through the second cable clamp on
the boiler chassis. Refer to the instructions supplied
with the control.
7. To connect external control(s) remove the link
between terminals 1 & 2. The 230V supply at terminal
1 must be connected to the external control. The
switched output from the external control must be
connected to terminal 2 (Fig. 43).
NOTE: If the room thermostat being used
incorporates an anticipator it MUST be wired as
shown in Fig. 43
IMPORTANT: The external control MUST be
suitable for 230V switching.
8. Ensure that both mains input and, where fitted,
external control input cables have sufficient slack to
allow the control box to drop down. Tighten the cable
clamp(s) on the boiler chassis.
9. If the optional integral timer is to be used it should
be fitted at this point. Refer to the instructions supplied
with the timer. NOTE: An external frost thermostat
cannot be used with the integral timer.
10.9
Preliminary Electrical Checks
1. Prior to commissioning the boiler preliminary
electrical system checks should be carried out.
2. These should be performed using a suitable meter,
and include checks for Ground Continuity,
Resistance to Ground, Short Circuit and Polarity.
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

47 474 03

Table of Contents