Equipment Setup; Original Test Setup For Hpa639 A Evaluation Board - Texas Instruments bq24650EVM User Manual

Synchronous, switch-mode, battery charge controller for solar power
Hide thumbs Also See for bq24650EVM:
Table of Contents

Advertisement

Test Summary
2.5.2
Loads
LOAD#1 A 30-V (or greater), 5-A (or greater) electronic load that can operate at constant current and
constant voltage mode.
LOAD#2: An HP 6060B 3-V to 60-V/0A to 60-A, 300-W system dc electronic load or equivalent.
2.5.3
Meters
Seven Fluke 75 multimeters (equivalent or better) or four equivalent voltage meters and three equivalent
current meters.
The current meters must be capable of measuring 5-A+ current.
2.6

Equipment Setup

1. Set the power supply #1 (PS#1) for 21-V ±500-mVdc, 2.5-A ±0.1-A current limit, and then turn off
supply.
2. Connect the output of PS#1 in series with a current meter (multimeter) to J1 (VIN, PGND).
3. Connect a voltage meter across J1 (VIN, PGND).
4. Connect Load#1 in series with a current meter to J2 (VOUT, PGND). Turn off Load#1.
5. Connect Load#2 in series with a current meter to J2 (VSYS, PGND). Turn off Load#2.
6. Connect a voltage meter across J2 (VOUT, PGND).
7. Connect a voltage meter across J2 (VSYS, PGND).
8. Check all jumper shunts. JP1: connect 1-2 (External TS); JP2: ON; JP3: connect 2-3 (Enable
TERM_EN); JP4: OFF.
Power supply
Iin
#1
Figure 1. Original Test Setup for HPA639 A Evaluation Board
6
bq24650EVM Synchronous, Switch-Mode, Battery Charge Controller for
Solar Power
BQ24650 EVM
HPA639
J1
I
VIN
V
PGND
/STAT1
SATATUS
D4
TERM_EN
CE
LEDPWR
EN
DIS
JP3
JP4
SETTINGS
Copyright © 2010, Texas Instruments Incorporated
TP2
SW
VSYS
VOUT
U1
PGND
TS
APPLICATION CIRCUIT
External
TS
Internal
JP1
/STAT2
D5
TEST POINTS
JP2
SLUU444A – August 2010 – Revised October 2010
I
Load #1
Isys
V
J2
I
Load #2
Iout
V
Submit Documentation Feedback