Royal CPR 28T Installation, User And Maintenance Manual page 44

Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION
CONFIGURATION 3
boiler to a storage tank with coil.
The boiler will be controlled (switch on and off) based
on the temperature read by the probe in the storage
tank.
The frost protection function can also be set in this
CONFIGURATION 4
boiler to a storage tank without coil.
The boiler will switch on based on the temperature
read by the probe in the storage tank, and will switch
off based on the boiler return temperature.
The frost protection function can also be set in this
Some typical installation diagrams are shown on
the last few pages of the booklet.
6.4 REVERSIBILITY OF THE DOOR
Fig. 6.4
The boiler has an outside door which can be mounted
as desired with left hand or right hand opening in
relation to the space available.
To modify its original position (opening to the right
screw the hinges on the other side.
44

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpr 35t

Table of Contents