Hoover HF7 12 E Instructions For Use Manual page 9

Table of Contents

Advertisement

Available languages

Available languages

40000391-Eng.qxd
18/09/2003
Testing the installation
Refer to the programme guide for details of how to select programmes.
1. Turn on the water supply and check for leaks from fill hose.
2. Switch on the electricity supply.
3. Select a spin programme and then press the "DEPART/PAUSE" button to start
the machine.
Allow the programme to continue for one minute and then cancel the
programme (please refer to "Description of Controls" section for cancelling the
programme). This will remove any water remaining in the machine from factory
testing.
4. To check for cold water filling to the machine:
Select a rinse programme and press the "DEPART/PAUSE" button to start the
machine.
Allow the tumble action to continue until the water has pumped out.
Check that the drain outlet is not leaking or overflowing.
5. Switch off the machine at the end of the cycle by turning the programme knob
to the "Arrêt" position.
6. If the machine takes longer than one minute to empty check the drain hoses
for kinks.
Installation testing is now complete.
08:52
Page 9
9

Advertisement

Table of Contents
loading

Table of Contents