If the unit is being lifted by two persons, ensure your
movements are coordinated during lifting.
▶
If required, get somebody to assist you in this.
4.3.3
Transporting the box from the delivery
point to the installation site – ground floor
▶
It is recommended that two people lift the unit together.
▶
Use safe lifting techniques – keep your back straight and
bend your legs at the knee.
4.4
Dimensions
3
35
100
12
1
Flue pipe wall duct
0020193968_03 ecoTEC exclusive Installation and maintenance instructions
4
5
6
7
8
10
9
440
1
2
3
4
5
6
7
35
100
188
11
2
Product holder
3
Heating flow
4
Hot water connection
5
Gas connection
6
Cold water connection
7
Heating return
Consult the installation template that is supplied to find the
dimension A.
The product's installation depth B can be found in the tech-
nical data in the appendix.
4.5
Minimum clearances
C
C
A
165 mm: Air/flue pipe, 60/100 mm diameter
275 mm: Air/flue pipe, 80/125 mm diameter
B
VUW 356/5-7: 180 mm; optimum approx.
250 mm
VUW 436/5-7: 300 mm; optimum approx.
340 mm
C
5 mm; optimum approx. 50 mm
D
500 mm in front of the heat generator to enable
easy access for maintenance work (may be
provided by an opening door).
4.6
Using the installation template
▶
Use the installation template to ascertain the locations at
which you need to drill holes and make perforations.
Set-up 4
8
Connection for the
heating expansion relief
valve drain line
9
Condensate trap con-
nection
10
Condensate trap
11
R1 tundish/condensate
trap connection
12
Flue pipe connection
D
Minimum clearance
9