Assembly / Pre-Operation - Craftsman SEARS 944.528398 Owner's Manual

1350 series b&s engine 27" two-stage power-propelled snow thrower
Table of Contents

Advertisement

ASSE
BLY/PRE-OPERATION
iNSTALL
CHUTE
DEFLECTOR
REMOTE
CONTROL
(See Figs. 8 and 9)
1.
Install remote cable bracket to discharge chute with
5/16-18 carriage bolt and 5/16-18 Iocknut as shown.
Tighten securely.
2.
Install remote cable eyelet to chute deflector with
1/4-20 shoulder bolt and 1/4-20 Iocknut as shown.
Tighten nut securely. Eyelet will be loose on shoulder
bolt.
3.
Install spring hooks between hex nuts on chute rotater
head and into hole in chute deflector as shown.
1/4-20
SPRING
SHOULDER
CHUTE
5/16-18
CARRIAGE
CABLE
EYELET
jj
_ \
REMOTE
CABLE
RACKET
5/16-18
LOCKNUT
Fig. 8
i
CHUTE DEFLECTOR
CONTROLLEVER
FIG, 9
CHECK TiRE PRESSURE
The tires on your snow thrower were overinflated at the fac-
tory for shipping purposes. Correct and equal tire pressure
is important for best snow throwing performance.
Reduce tire pressure to 14-17 PSI.
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

944.528398

Table of Contents