EarthStone 160-PAGW Installation Instructions Manual page 8

Table of Contents

Advertisement

EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---
Important: Chases should be made of non-combustable materials.
I
TYPE-I EXHAUST HOOD-Installed per NFPA 96, standard for ventilation control and
fire protection of commercial cooking operations. (For commercial applications
only)
1.
If required, a Type 1 hood must be placed above the cooking opening and set on the top
of the oven. The minimum exhaust hood dimensions are 40 in. wide, 37 in. deep and 22
inches high. Refer to Fig. 16 & 17, PG. 7 & 8.
Duct Velocity 1500-2500 FPM - Volume: 800-1000 CFM
2.
The grease filters must be positioned at the rear of the exhaust hood and must be of the
steel baffle type (Mesh type grease filters must not be used).
3.
The front of the exhaust hood is to set forward 10 inches from the front of the oven face.
The face of the filter must be a minimum of 42 inches from the oven heath per the
Uniform Mechanical Codes. (UMC) or 48 inches per NFPA 96. When the exhaust hood is
fabricated, it is recommended that the bottom portion which is set on the oven(sheet
metal lid) be closed for ease of cleaning. Refer to Fig 16 & 17, pg. 7 & 8.
4.
The sides of the exhaust hood must extend a minimum of 6 inches to either side of the
oven door opening.
5.
There must be a minimum of 3 inches of clearance between the hood and any
combustible surface.
6.
The exhaust duct is to be constructed as vertical as possible, free of offsets and
horizontal runs. If a horizontal run is needed then refer to the Grease Duct/Building
Heating Appliance installation section.
II.
U.L. LISTED GREASE DUCT/BUILDING HEATING APPLIANCE CHIMNEY
INSTALLATION (DIRECT VENTING)
1.
A U.L. listed Grease Duct/Building Heating Appliance Chimney may be connected
to the opening in the primary hood of the oven. Refer to Fig. 18, pg. 9 (10 for
residential applications).
Metalbestos Model PS and IPS Grease Duct Installation Instructions (Numbers 8 or
9) or Metal-Fab IPIC Installation Instructions.
A field-built duct, constructed and installed to the specifications of a grease duct, as
detailed in NFPA 96 or the International Mechanical Code, may also be used.
Volume: 150-200 CFM at oven flue collar
Models:
WOOD STORAGE
Wood storage shall not exceed a one-day supply where stored in the same room as the
oven. Refer to NFPA 96 for wood storage requirements.
OVEN CURING
Oven is pre-cured; however the first two fires should be small in order to properly cure the
masonry in the unit. One fire each day for one hour, for a total of two days. See page 19.
For specific installation requirements refer to Selkirk
Metal-Fab IPIC or Value G (metal-fabcommercial.com)
or Selkirk Metalbestos Model IPS (selkirkcorp.com)
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

130-pag130-pacb110-pag120-pa110-pa

Table of Contents