Trane 4YCC4024A1060A Installer's Manual page 18

Single packaged gas/electric 4 seer convertible, 2-5 ton
Table of Contents

Advertisement

S S t t e e p p 4 4 — — U U n n i i t t I I n n s s t t a a l l l l a a t t i i o o n n
Table 5. Typical Rooftop Down Airflow Application with Frame
Return Air
Roof Flashing
D D u u c c t t w w o o r r k k I I n n s s t t a a l l l l a a t t i i o o n n
A A t t t t a a c c h h i i n n g g D D o o w w n n f f l l o o w w D D u u c c t t w w o o r r k k t t o o R R o o o o f f C C u u r r b b
Supply and return air flanges are provided on the roof
curb for easy duct installation. All ductwork must be
run and attached to the curb before the unit is set into
place.
A A t t t t a a c c h h i i n n g g D D o o w w n n f f l l o o w w D D u u c c t t w w o o r r k k t t o o R R o o o o f f F F r r a a m m e e
Follow these guidelines for ductwork construction:
Connections to the unit should be made with three (3)
inch canvas connectors to minimize noise and vibration
transmission.
Elbows with turning vanes or splitters are
recommended to minimize air noise and resistance.
The first elbow in the ductwork leaving the unit should
be no closer than two (2) feet from the unit, to minimize
noise and resistance.
To prevent leaking, do not attach the ductwork to the
bottom of the unit base. Refer to the bottom example in
Figure 9, p. 18
18
Channel Iron Center Support
(center support required on all
frame applications).
Roof
Flashing
Angle Iron Frame
Figure 9. Attaching Down Airflow Ductwork
AIR PROOF
THIS SEAM
FIELD DUCT
UNIT DUCT
FLANGE
UNIT DUCT
FLANGE
FIELD DUCT
FIELD
DUCT
UNIT DUCT FLANGE
UNIT DUCT
FLANGE
NOT RECOMMENDED
Supply
Air
UNIT BASE
AIR PROOF
THIS SEAM
UNIT BASE
AIR PROOF
THIS SEAM
UNIT BASE
UNIT BASE
WATERPROOF SEAM
WITH BUTYL OR
SILICONE
FIELD DUCT
18-EB31D1-1F-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents