Unpacking and Setup
Now you have a good understanding of the cabling rules, your
own cabling environment, and the expected network load on your
workgroups. You are ready to integrate your TE-100/S14 Switch
with your network.
The following sections delineate the steps to setup, connect and
integrate your newly acquired TE-100/S14 Switch into your
network.
U
NPACKING
The TE-100/S14 Switch shipping carton (refer to Figure Chapter
2 -3
) should contain the following items:
•
1 TE-100/S14 unit
•
1 AC power cord
•
2 Mounting brackets
•
This user guide
If any item is found missing or damaged, please contact your local
TRENDnet reseller for replacement.
Figure Chapter 2 -3, Unpacking a TE-100/S14
Switch
14