Download Print this page

LG ZPLT1A51A Installation Manual page 19

Drain pan heater

Advertisement

Step 5
5. Remove outdoor unit front panel to access internal components.
Figure 11: Multi V 5 ODU Front Panel.
Top view
Rear
Right
Left
Front
6 Ton Control Box access
Step 6
6. After removing the outdoor unit front panel to access internal components, attach the Contact Box Cover as shown below to the outdoor
unit control box.
• Attach on the right hand side of the unit control box for the 6 Ton ODU.
• Attach on the left hand side of the control box for 8 - 20 Ton ODU.
• Use two of the self-drilling #8, ½" screws in the installation kit.
Remove the Contactor Mounting Plate Subassembly from the Contactor Box Cover first.
Figure 12: Attach contact box cover for 6.0 Ton Multi V 5 ODU unit.
Front view
Do not damage the electrical components inside the oudoor unit control box when drilling screws.
Damaged wiring runs the risk of fire, electric shock, and physical injury or death.
Turn off power to outdoor unit before installation.
Electric shock can cause physical injury or death.
DRAIN PAN HEATER INSTALLATION
Top view
Rear
Left
Front
8 - 20 Ton Control Box access
6 Ton Multi V 5 Outdoor Unit
Side view
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Right
Control box front view
Verify the wires are
routed such that they
do not get pinched,
placed in tension or
rub against any sharp,
metal edge prior to
securing.
Damaged wiring runs the
risk of fire, electric shock,
and physical injury or death.
19

Advertisement

loading

This manual is also suitable for:

Multi v 5Zplt1a52aZplt2a51aZplt2a52a