Installing The Catalytic Converter - Tightening Specification And Sequence - Volkswagen Jetta Hybrid 2014 Quick Reference

Hide thumbs Also See for Jetta Hybrid 2014:
Table of Contents

Advertisement

8 - Bolt
Not installed
9 - Bolt
Not installed
10 - Front Exhaust Pipe with Catalytic Converter
11 - Screw-Type Clamp
Tightening specification and sequence, see Installing the Catalytic
Converter - Tightening Specification and Sequence below
12 - Seal
Replace after removing
13 - Turbocharger
14 - Nut
30 Nm
15 - Front Clamping Sleeve
Installing the Catalytic Converter -
Tightening Specification and Sequence
Stage
1
Place the catalytic converter -1- on
the turbocharger and loosely attach
a new v-clamp -6-.
2
- Loosely install nuts -2, 4 and 5- by
hand.
● Catalytic converter -1- and bracket
-3- need to be able to move.
3
Tighten v-clamp -6-.
4
Tighten all bolts and nuts.
VW Jetta Hybrid Quick Reference Specification Book • February 2014
Bolts and Nuts
Tightening specification
Tighten loosely hand tight.
Tighten loosely hand tight.
15 Nm
20 Nm
91

Advertisement

Table of Contents
loading

Table of Contents