Gas Connection With Natural Gas - Rinnai E75CRN Installation & Servicing Instructions Manual

High efficiency condensing gas boiler
Table of Contents

Advertisement

Available languages

Available languages

6.4.1
i
NOTICE
Sediment trap
figure 10
i
NOTICE
!
DANGER
i
NOTICE
Natural gas:
When propane gas is desired, the boiler can be converted to propane gas by means
of a conversion kit. Rinnai Part number:
E50CR:
803000014
E75CR:
804000015
E110CR:
804000016
Propane gas:
When natural gas is desired, the boiler (not for E50CRN) can be converted to natural
gas by means of a conversion kit. Rinnai Part number:
E75CR:
804000023
E110CR:
804000024

Gas connection with natural gas

The gas supply connection must comply with local regulations or, if such
regulations do not exist, with the National Fuel Gas Code, ANSI Z 223.1.
For Canada, the gas connection must comply with local regulations or, if such
regulations do not exist, with the CAN/CSA B149.1, Natural Gas and Propane
Installation Code.
Pipe sizing for natural gas
Contact gas supplier to size the gas supply line and meter.
Gas piping
A sediment trap must be installed upstream of the boiler.
The boiler gas pipe is equipped with external 3/4" M-NPT thread. Use appropriate
sealing.
The connection to the boiler must include a suitable method of disconnection and a gas
control valve must be installed adjacent to the boiler for isolation purposes. The nominal
inlet gas pressure measured at the boiler should be 7" W.C. (18 mbar) for Natural gas
(Gas A). Maximum pressure with no flow (lockup) or with the boiler running is 10.5
inches W.C. Minimum pressure with the gas flowing (verify during boiler startup) is
3.0 inches W.C.
The gas pipe must be properly supported and connected to the boiler.
Make sure that the gas pipe system does not contain dirt, particularly with new
pipes.
Always check the safety of the gas pipe system by means of a bubble test using
leak-search spray.
The boiler must be isolated from the gas supply piping system by closing its
individual manual shutoff valve during any pressure testing of the gas supply
piping system at test pressures equal to or greater than 1/2 PSI (3.5 kPa).
resume with chapter 6.4.1
resume with chapter 6.4.2
21