Installation - Kohler ODEON K-20979T-SW Installation Instructions Manual

Vitreous china wall-hung p-trap toilet
Hide thumbs Also See for ODEON K-20979T-SW:
Table of Contents

Advertisement

INSTALLATION

1. Install Flushing Mechanism
1-1. Install The Tank
·
Turn the water supply off before installing the new toilet.
·
Install the concealed tank system in wall before
decorating the wall.
·
Install the tank system per tank's installation instructions.
Note: Refer to installation instructions of in-wall tank for SKU
of faceplate.
Recommended rank dimension(Fig.#2-b)
1) Rank height should be adjust between 0~200mm.
2) Rank should support weight 400kg.
1.
1-1.
·
·
·
( 2-b)
1)
2)
400kg
1-2. Install Manual Valve Or Sensor
Refer to installation instructions of manual valve ro sensor for
the installation of flushing mechanism.
1-2.
2. Set The Spacing Of The Bowl
After you install the tank, be careful to set the spacing of the
bowl on wall according to the dimensions as shown.
2.
1207926-T01-D
0~200mm
325
Carrier Studs
Fig.#3
3
-4-
Fig.#2-a
2-a
180
35
135
Fig.#2-b
2-b
Unit: mm
:
1
25 2
400kg
400 10

Advertisement

Table of Contents
loading

Table of Contents