Cisco 4112 Hardware Installation Manual page 47

Hide thumbs Also See for 4112:
Table of Contents

Advertisement

Installation Preparation
Warning
Statement 7005—Intrabuilding Lightning Surge and AC Power Fault
The intrabuilding port(s) of the equipment or subassembly must not be metallically connected to interfaces
that connect to the outside plant (OSP) or its wiring. These interfaces are designed for use as intrabuilding
interfaces only (Type 2 or Type 4 ports as described in GR-1089-CORE) and require isolation from the exposed
OSP cabling. The addition of primary protectors is not sufficient protection to connect these interfaces
metallically to OSP wiring.
This statement applies to the intrabuilding ports listed below:
Gigabit Ethernet management port
RJ-45 1 G/100 M/10 M auto duplex/auto MDI-X Base-T ports
Warning
Statement 7012 Equipment Interfacing with AC Power Ports
Connect this equipment to AC mains that are provided with a surge protective device (SPD) at the service
equipment that complies with NFPA 70, the National Electrical Code (NEC).
Note
Statement 7013 Equipment Grounding Systems—Common Bonding Network (CBN)
This equipment is suitable for installations using the CBN.
Note
Statement 7016—Battery Return Conductor
Treat the battery return conductor of this equipment as DC-I.
Note
Statement 7018 System Recover Time
The equipment is designed to boot up in less than 30 minutes provided the neighboring devices are fully
operational.
Note
Statement 8015 Installation Location Network Telecommunications Facilities
This equipment is suitable for installation in network telecommunications facilities.
Note
Statement 8016 Installation Location Where the National Electric Code (NEC) Applies
This equipment is suitable for installation in locations where the NEC applies.
Network Equipment-Building System (NEBS) Statements
Cisco Firepower 4112, 4115, 4125, and 4145 Hardware Installation Guide
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

411541254145

Table of Contents