HP pocurve switch 408 Installation Manual page 19

Table of Contents

Advertisement

Power and Fault LEDs
When the switch is powered on, it performs its diagnostic self
test. The self test takes approximately 3 seconds to complete.
LED Behavior:
During the self test:
All the switch and port LEDs are on.
When the self test completes successfully:
The Power LED stays on and the Fault LED goes off.
The port LEDs (Link/Act, FDx, and 100) go into their normal
operational mode.
If the LED display is different than what is described above,
especially if the Fault LED stays on for more than 5 seconds, the
self test has not completed correctly. Refer to chapter 3, "Trou-
bleshooting" for diagnostic help.
Installing the Switch 408
Installation Procedures
Switch port LEDs
2-7

Advertisement

Table of Contents
loading

Table of Contents