Mitsubishi Electric PLA-ZRP35BAR1.UK Service Manual page 46

Table of Contents

Advertisement

OPERATING PROCEDURE
10. Removing the drain pump (DP) and float switch (FS)
(1) Remove the drain pan. (See Photo 6)
(2) Cut the hose band and remove the hose.
(3) Remove the drain pump assembly (3 screws and 2 hooks).
(4) Remove the drain pump (3 screws).
(5) Remove the float switch (2 screws).
11. Removing the heat exchanger
(1) Remove the drain pan. (See Photo 6)
(2) Remove the 3 screws of the piping cover, and pull out
piping cover.
(3) Remove the 2 screws of coil plate.
(4) Remove the 2 screws of the coil.
(5) Remove the screw of the coil support.
(6) Pull out the heat exchanger.
OCH535A
PHOTOS & ILLUSTRATIONS
Photo 8
Float switch
Hose band
Drain pump
Photo 9
Drain pump fixing screw
Photo 10
Piping cover
Coil plate
Heat exchanger
fixing screw
Coil support fixing screw
46
Drain pump
assembly fixing screw
Float switch fixing screw
Heat exchanger
Coil support

Advertisement

Table of Contents
loading

Table of Contents