Periodic Testing - Samson EB 8061 EN Translation Of Original Instructions

Table of Contents

Advertisement

Note
The control valve was checked by SAMSON
before it left the factory.
− Certain test results certified by SAMSON
lose their validity when the valve is
opened. Such testing includes seat leakage
and leak tests.
− The product warranty becomes void if ser-
vice or repair work not described in these
instructions is performed without prior
agreement by SAMSON's After-sales Ser-
vice.
− Only use original spare parts by
SAMSON, which comply with the original
specifications.
We recommend the following inspection and testing which can be performed while the pro-
cess is running:
Inspection and testing
Check the markings, labels and
nameplates on the valve for their
readability and completeness.
Check the pipe connections and gaskets
on the valve and actuator for leakage.
EB 8061 EN

9.1 Periodic testing

Depending on the operating conditions,
check the valve at certain intervals to prevent
possible failure before it can occur. Plant op-
erators are responsible for drawing up an
inspection and test plan.
Tip
Our after-sales service can support you in
drawing up an inspection and test plan for
your plant.
Action to be taken in the event of a negative result:
Immediately renew damaged, missing or incorrect
nameplates or labels.
Clean any inscriptions that are covered with dirt and are
illegible.
Check the bolted joint (tightening torque).
Replace the gasket on the flanged joint as described in
section 9.4.1 and section 9.4.2.
Version with adjustable packing 
information under 'Adjusting the packing' in the
'Installation' section > 'Testing the installed valve'). If the
packing leaks continuously, replace the packing (see
section 9.4.3).
Servicing
: tighten the packing (see
1)
9-3

Advertisement

Table of Contents
loading

Table of Contents