Wiring The Power Inputs - Planet IGS-5225-4T2S Quick Installation Manual

Industrial l2+ multi-port full gigabit managed ethernet switch
Hide thumbs Also See for IGS-5225-4T2S:
Table of Contents

Advertisement

3. Wiring the Power Inputs

The Upper Panel of the Industrial Managed Switch comes with one
6-contact terminal block. Please follow the steps below to insert the power
wire.
1. Insert positive/negative DC power wires into Contacts 1 and 2 for Power 1,
or Contacts 5 and 6 for Power 2.
 IGS-5225-8P4S/IGS-5225-8P2T2S/IGS-5225-8P2T4S: DC 48~54V
Figure 3-1: IGS-5225-8P4S/IGS-5225-8P2T2S/IGS-5225-8P2T4S Upper Panel
 IGS-5225-4UP1T2S: DC 48~54V
 IGS-5225-4T2S: DC 12~48V, AC 24V
6
DI0
1 2 3 4 5 6
Max. Fault Alarm Loading: 24V, 1A
1 2 3 4 5 6
Dual power input is required
for maximum PoE loading.
Refer to user's manual for
more details.
DI0
DI1 DO0 DO1
1 2 3 4 5 6
Max. Fault Alarm Loading: 24V, 1A
1 2 3 4 5 6
V1+
PWR1
Alarm
Figure 3-2: IGS-5225-4UP1T2S Upper Panel
Max. Fault Alarm Loading: 24V, 1A
1 2 3 4 5 6
V1+
PWR1
Alarm
Figure 3-3: IGS-5225-4T2S Upper Panel
DI1 DO0 DO1
GND
GND
DC Input:
48-54V
, 6A max.
Earth Ground
GND
GND
DC Input:
V2+
48-54V
, 8.3A max.
PWR2
V2+
DC Input: 12-48V
, 1.7A max.
AC Input: 24V
, 1A max.
PWR2

Advertisement

Table of Contents
loading

Table of Contents