IBM FC 2704 Installation Instructions Manual page 35

Table of Contents

Advertisement

Baffle installation:
The baffle uses 2U for installation.
__ 5. See Figure 24. The baffle is installed at the front of the frame in EIA positions 33 and 34.
__ 6. Locate two screws PN 23R6559 1 and two standoffs PN 23R9198 3 packaged with the 26-port
switch.
__ 7. Slide the baffle 2 part way into EIA positions 33 and 34. Install a screw 1 into both sides of the
baffle, then put a standoff 3 on each screw.
__ 8. Slide the baffle into place and tighten both screws.
2
1
Figure 24. Installing the baffle (Front of frame view)
3
Installation (Sections 9 through 12)
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fc 2725Fc 2748Fc 5512

Table of Contents