Installing The 26-Port Switch And Baffle - Fc 2704 - IBM FC 2704 Installation Instructions Manual

Table of Contents

Advertisement

10.4 Installing the 26-port Switch and Baffle - FC 2704

6
7
2
3
4
Figure 23. Installing the 26-port switch (Rear of frame view)
26-port switch installation:
The 26-port switch uses 1U in the frame and 2U for installation.
__ 1. See Figure 23. Install the side rails 1 along with item 6 on the frame where the switch will be
installed. Secure with four screws 7 as shown in EIA positions 33 and 34.
__ 2. Assemble the mounting brackets 2 to the 26-port switch 5 using the eight M3 X 6 screws 3 .
__ 3. Mount the bracket and switch assembly to the frame using the two M5 X 14 screws 4 at EIA
position 33.
__ 4. Connect the power cable to the 26-port switch. Push the other end of the power cable through the
hole on the side of the mounting bracket and out the back of the frame.
28
FC 2704, 2725, 2748, & 5512
1
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fc 2725Fc 2748Fc 5512

Table of Contents