Table Of Contents - GE Entelli-Switch 250 Operation And Maintenance Manual

Microprocessor controller transfer switch control panel
Table of Contents

Advertisement

Authorized Service
For GE parts and service, call: (773) 299-6600

Table of Contents

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12
Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13
Final Equipment Inspection . . . . . . . . . . . . . .13
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
Initial Energization . . . . . . . . . . . . . . . . . . .14-5
Control Connections . . . . . . . . . . . . . . . . . . . .6
Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17
LCD & Keypad . . . . . . . . . . . . . . . . . . . . . . . .18
Accessory Group Packages. . . . . . . . . . . . . . . .10
Accessory Definitions . . . . . . . . . . . . . . . . .11-14
How to Set the System Clock . . . . . . . . . . . . .14
CDT One Event Timer Exerciser . . . . . . . . . .15
CDP Clock Exerciser . . . . . . . . . . . . . . . . . . . .16
User Setup - CFG Menu . . . . . . . . . . . . . . . . .17
User Setup - SET Menu . . . . . . . . . . . . . . . . . .18
User Setup - System Info . . . . . . . . . . . . . . . . .19
GE Zenith Transfer Switches are used to provide a continuous source of power for lighting and other critical loads by
automatically transferring from source 1 power to source 2 power in the event that source 1 voltage falls below preset limits.
Voltage sensing and system control is performed via a state-of-the-art microcontroller located on the cabinet door.
It is designed to give highly accurate control of the transfer switch system.
All GE Zenith transfer switches are designed for use on emergency or standby systems, and are rated for total system or
motor loads. Transfer switches are UL Listed under Standard 1008 and CSA Certified under Standard C22.2 No. 178 and
IEC Listed under Standard 947.
S: A protective device such as a molded case circuit breaker or fused
NOTE
disconnect switch MUST be installed on both sources of incoming
power for circuit protection and as a disconnection device.
All references made within this manual about the term "S1" or
"Source 1" relate to a Normal Power Source. All references made
about the term "S2" or "Source 2" relate to an Emergency
or Alternative Power Source.
Page
Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .120
Sequence of Operation . . . . . . . . . . . . . . . . . . . . .24
Relay/Transformer (R/T Box) . . . . . . . . . . . . . . .26
Troubleshooting & Diagnostics . . . . . . . . . . . . . . .29
Maintenance and Testing . . . . . . . . . . . . . . . . . . . .30
Get other manuals https://www.bkmanuals.com
Introduction . . . . . . . . . . . . . . . . . . . . . . . . .120
Test Options . . . . . . . . . . . . . . . . . . . . . . . . . .20
Standard Transition . . . . . . . . . . . . . . . . . . . .121
Delayed Transition . . . . . . . . . . . . . . . . . . . . .21
Closed Transition . . . . . . . . . . . . . . . . . . . . . .22
for Extended Parallel Time . . . . . . . . . . . . . . .23
Standard Transition . . . . . . . . . . . . . . . . . . . .124
Delayed Transition . . . . . . . . . . . . . . . . . . . . .24
Closed Transition . . . . . . . . . . . . . . . . . . . . . .25
Standard . . . . . . . . . . . . . . . . . . . . . . . . . . . .126
Delay . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .127
Schematics . . . . . . . . . . . . . . . . . . . . . . . . . . .128
Inspection and Cleaning . . . . . . . . . . . . . . . . .30
Servicing . . . . . . . . . . . . . . . . . . . . . . . . . . . .130
Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .130
Page

Advertisement

Table of Contents
loading

Table of Contents