Fujitsu ASYA07LBCM Service Manual page 18

Table of Contents

Advertisement

3. Defrost Flow Chart
The defrosting shall proceed by the integrating operation time
and outdoor heat exchanger temperature as follows.
Outdoor temp. > 3°C
Outdoor heat exchanger
temperarure:
Below -8°C
Heating operation start : Compressor ON
Compressor integrating
operation:
45 minutes and over
3 > Outdoor temp. > -1°C
=
Outdoor heat exchanger
temperarure:
Below -12°C
Defrost start
Defrost Indicator:
[Operation lamp]
7 sec ON / 2 sec OFF
Outdoor heat exchanger temperature: Over 10°C
or
Compressor ON time: Over 15 minutes
Defrost end
(Not defrosted for 6 or 10 minutes)
-1 > Outdoor temp. > -5°C
=
Outdoor heat exchanger
temperarure:
Below -14°C
3 sec later Compressor OFF
3 sec later Outdoor fan motor OFF
28 sec later 4-way valve OFF
34 sec later compressor ON
(Frequency : 90 Hz)
01-15
-5°C > Outdoor temp. > -10°C
=
Outdoor heat exchanger
temperarure:
Below -16°C
-10°C > Outdoor temp.
=
Outdoor heat exchanger
temperarure:
Below -18°C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Asya09lbcmAsya12lbcmAoya14lac2

Table of Contents