Installing Hardware Options And Setting Switches; Installing The Rack-Mounting Hardware And The Server - Compaq ProLiant 850R Setup And Installation Manual

Hide thumbs Also See for ProLiant 850R:
Table of Contents

Advertisement

2-8
Server Installation Overview
Installing Hardware Options and
Setting Switches
General tasks that are performed regularly are included at the end of this
chapter, these task include:
Removing and installing the server cover
Removing and installing the front bezel
Securing the System using a padlock
Refer to Chapter 3, "Installing Hardware Options" for hardware option
installation procedures. For information on switch settings refer to
Appendix D, "Switches and Jumpers" and for battery jumper settings refer
to Appendix B, "Installing a New Battery."
Installing the Rack-Mounting
Hardware and the Server
Installing the server into the rack is a straight forward process. The sections
below provide the necessary information to install the rack hardware and place
the server into the rack.
CAUTION: Protect the server from power fluctuations and temporary
interruptions with a regulating uninterruptible power supply (UPS). This
device protects the hardware from damage caused by power surges and
voltage spikes and keeps the system in operation during a power failure.