Initial Startup - Blodgett DFG100-N Installation Operation & Maintenance

Gas convection ovens
Table of Contents

Advertisement

Installation

Initial Startup

The following is a check-list to be completed by qualified
technician prior to turning on the appliance for the first
time.
1. Open the manual shut-off valve at the rear of the
oven.
2. Remove the control panel and combustion covers.
3. Verify the combination valve's manual shut-off is in
the on position.
4. Turn the selector switch to Cook, and the thermostat
to 500°F (260°C).
The oven main burner lights, and the Oven Ready Light
comes on. With the main burner on, check the following.
1. Verify there are no gas leaks, by checking all gas con-
nections with a soapy water solution.
2. Verify that the inlet pressure is correct. The inlet pres-
sure can be checked at the pressure tap located on
the combination valve's inlet side.
3. Verify that the manifold pressure is correct. The mani-
fold pressure can be checked at the pressure tap lo-
cated on the manifold.
4. If the above pressure readings are set to the recom-
mended pressure requirements, allow the oven to
burn-off for 2 hours. If the pressure readings are not
set correctly, turn off the oven and readjust accord-
ingly.
WARNING
The break in procedure burns off excess
oils present in the metals during fabrication.
Smoke may be produced. Proper ventilation is
required.
Adjustments associated with initial installation
Each oven, and its component parts, have been thorough-
ly tested and inspected prior to shipment. However, it is
often necessary to further test or adjust the oven as part
of a normal and proper installation. These adjustments
are the responsibility of the installer, or dealer. Since
these adjustments are not considered defects in mate-
rial or workmanship, they are not covered by the Original
Equipment Warranty. They include, but are not limited to:
calibration of the thermostat
adjustment of the doors
burner adjustments
leveling
testing of gas pressure
tightening of fasteners.
No installation should be considered complete without
proper inspection, and if necessary, adjustment by quali-
fied installation or service personnel.