Boiler Main Components - Bosch WORCESTER GREENSTAR Ri ErP Series Installation, Commissioning And Servicing Instructions

Wall hung rsf gas fired condensing boiler
Table of Contents

Advertisement

APPLIANCE INFORMATION
3.4

BOILER MAIN COMPONENTS

28
27
26
25
24
23
22
21
20
19
1
Air/Gas Manifold
2
Sensor - Boiler flow
3
Flow pipe
4
Return pipe
5
Removable servicing panel
6
Electrode assembly
7
Overheat thermostat
8
Silicon tube - Heat Exchanger air vent
9
Heat Exchanger
10
Flue overheat thermostat
11
Access panel - Heat Exchanger/Sump cleaning
12
Return connector with drain point
13
Flow connector
14
Boiler Temperature control and Reset knob
10
1
2
3
18
17
4
5
16
15
15
Power and fault indicator (blue)
16
Wiring connections cover
17
Burner indicator (green)
18
Boiler ON/OFF switch
19
Condensate connection
20
Syphon / Trap
21
Gas inlet connection
22
Mains cable inlet
23
Gas Valve
24
Flue air pressure switch connection
25
Fan
26
Manual vent point
27
Fan pressure test point
28
Air pressure switch
6
7
8
9
10
11
12
13
14
Greenstar Ri
ErP
- 6 720 813 283 (2016/07)

Advertisement

Table of Contents
loading

Table of Contents