Filling the installation

46
Curve 50
6.5.1

Flushing the system

Flush thoroughly and treat the system according to guidance given in BS
7593.
6.5.2

Fill the installation

A filling point connection on the central heating return pipework must be
provided to facilitate initial filling and pressurising and also any subsequent
water loss replacement/refilling.
1. Fill the installation using approved equipment and in accordance
with all relevant water supply regulations.
Important
Your attention is drawn to:
for GB: Guidance G24.2 and recommendation R24.2 of the Wa­
ter Regulations Guide.
for IE: the current edition of I.S. 813 "Domestic Gas Installa­
tions" .
2. The sealed primary circuits may be filled or replenished by means of
a temporary connection between the circuit and a supply pipe, provi­
ded a 'Listed' double check valve or some other no less effective
backflow prevention device is permanently connected at the inlet to
the circuit and the temporary connection is removed after use.
3. Fill or replenish the sealed primary circuits by means of a temporary
connection between the circuit and a supply pipe:
Permanently connect a 'Listed' double check valve or some other
no less effective backflow prevention device at the inlet to the cir­
cuit.
Remove the temporary connection after use except if where a per­
manent connection is used.
6.5.3

Filling the condensate trap

1. Check that the boiler condensate trap has been primed before com­
missioning the boiler.
PN-0000629

Advertisement

Table of Contents
loading

This manual is also suitable for:

302525 lpg30 lpg

Table of Contents