Final Placement

After the utilities and refrigeration connections
have been made, secure the unit to the dispenser
or bin top.
Secure ice making section to dispenser or bin
adapter.
Use strap/clips to secure unit. On some bins or
dispensers it may be necessary to drill small holes
and use field supplied sheet metal screws to
secure the ice making head to that bin, dispenser
or adapter.
If the ice maker & bin or dispenser is not yet in its
final position gently move it there.
Note: The refrigerant lines above the machine
must be able to move freely while the machine is
being moved into position.
Final Check List Before Initial Start Up
1. Confirm that the ice making section is installed
indoors in a controlled environment.
2. Confirm that all packing materials have been
removed from all products.
3. Confirm that the ice making section is level.
4. Confirm that all the refrigerant connections
have been made and checked for leaks.
5. Confirm that the proper power supply has been
turned on to the condensing unit.
6. Confirm that cold, potable water has been
supplied to the ice making section and checked
for leaks.
7. Confirm that the water supply is adequate.
8. Confirm that there is adequate water pressure
and that any water filters have been checked to
confirm that the cartridges do not need
changing.
9. Confirm that the proper size drain tubing has
been installed and properly routed.
10. Confirm that the ice making section has been
connected to the proper power supply.
11. Confirm that the interconnecting wire has been
routed and connected between the ice making
section and the compressor package.
12. Confirm that the bin thermostat has been
properly installed.