Ground The Chassis - Cisco 3100 Series Hardware Installation Manual

Secure firewall
Table of Contents

Advertisement

Rack-Mount the Chassis
Figure 43: Inner Rail Release Clip
Inner rail release clip
1
Step 7
Use the captive screws on the front of the mounting brackets to fully secure the chassis to the rack.
What to do next
• See
• Install the cables according to your software configuration as described in the

Ground the Chassis

Note
Ground the Chassis, on page 61
3100 Getting Started
Guide.
Grounding the chassis is required, even if the rack is already grounded. A grounding pad with two threaded
M4 holes is provided on the chassis for attaching a grounding lug. The grounding lug must be Nationally
Recognized Testing Laboratory (NRTL)-listed. In addition, a copper conductor (wires) must be used and the
copper conductor must comply with National Electrical Code (NEC) code for ampacity.
Inner rail attached to chassis
2
for the procedure to ground the Secure Firewall 3100.
Cisco Secure Firewall 3100 Series Hardware Installation Guide
Ground the Chassis
Cisco Secure Firewall
61

Advertisement

Table of Contents
loading

This manual is also suitable for:

31053110312031303140

Table of Contents