Download Print this page

Kohler PATIO S-TRAP K-20171T Installation Instructions Manual page 4

Skirted 3.0/4.5l class five+ 1pc toilet

Advertisement

TO INSTALL BOWL
Position the template and align with
drain hole.
Mark down the position of foot and 5
holes.
Drive holes on ground with the driver
of 10mm (3/8"), then insert anchor to
holes.
Install brackets.
Firmly press the toilet gasket onto the
toilet outlet of plastic trap.
NOTE 1:
Wax ring type toilet gasket
should not be installed at temperatures
o
less than 21 C.
NOTE 2:
If you are using a toilet
gasket with an integral plastic sleeve,
make sure the gasket is positioned
with the sleeve facing away from the
toilet.
Install plastic to ground and mounted
with 3 set of bolts (not supplied) firmly.
Carefully align and lower the bowl.
Apply weight to the bowl rim to let the
outlet insert into plastic trap.
1326100-T01-B
Drain Hole
Fig.#4
4
Fig.#5
5
Fig.#6
6
Plastic Trap Outlet
Fig.#7
7
Fig.#8
8
Outlet
Plastic Trap
Fig.#9
9
-4-
10mm
3/8
10mm
Toilet Gasket
1
2
)
o
21
C
3
(

Advertisement

loading

This manual is also suitable for:

Patio s-trap k-20171t-sPatio s-trap k-20172tPatio s-trap k-20172t-s