Finishing; Glass Door Removal And Installation; Log, Grate, And Ember Bed Assembly Removal - Napoleon Cinema Elite Installation And Operation Manual

Table of Contents

Advertisement

Available languages

Available languages

!
WARNING
Power supply service must be completed prior to finishing in order to avoid reconstruction.
Heat vents and air openings cannot be covered under any circumstances.
5.1

glass door removal and installation

WARNING
!
Facing and/or finishing material must not interfere with air flow through air openings, louvre openings, operation
of louvres or doors, or access for service. Observe all clearances when applying combustible materials.
Before the door is removed, turn the appliance off and wait until the appliance is cool to the touch. Doors are
heavy and fragile, so handle with care.
Remove the 4 screws from the appliance (Fig. 1).
A.
Remove the glass front, and place it on a soft, non-abrasive surface.
B.
Reverse these steps to reinstall the glass front.
C.
5.2

log, grate, and ember bed assembly removal

For Model NEFB24H-3A-1 and NEFB27H-3A-1:
Remove the 4 screws securing the ember bed to the side and bottom of the appliance (Fig. 1).
A.
Lift the log, grate and ember bed up from the appliance and remove.
B.
Screw
Screw
For Model NEFB29H-3A-1:
Remove the packaging materials holding the logs, grate and ember bed assembly to the appliance.
A.
Pinch the back of the assembly and lift it up from the appliance.
B.
BOTTOM VIEW OF APPLIANCE
NEFB27H-3A-1 Illustrated

5.0 finishing

Screw
SCREW
Fig. 1
Screw
Screw
Fig. 1
W415-1821 / B / 08.23.18
EN
17

Advertisement

Table of Contents
loading

Table of Contents