Flue Duct Preparation And Assembly - Worcester benchmark ZWB 7-25 R 25 HE Design, Installation And Servicing Instructions

Table of Contents

Advertisement

Flue
Turret
Fig. 18 Flue with one extension
Flue
Turret
Clamp
Fig. 19 Flue with extensions
Flue
Turret
Fig. 20 Flue components
3.9.3

Flue duct preparation and assembly

Measure the flue length L. Refer to fig. 21, 22.
6 720 611 441 GB (03.11)
Maximum 1600mm
Extension
Clamp
Duct
Extension
Clamp
Duct
Clamp
Flue Terminal
Terminal
Assembly
6 720 610 599 - 00.TD
Extension
Clamp
Duct
Extension Flue Duct
Wall Sealing Gasket
6 720 610 599 - 01.TD
Installation
Outer
Wall
Outer
Wall
Terminal
Assembly
6 720 610 599 - 01.TD
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Benchmark zwb 7-30 r 30 he47 311 7747 311 78

Table of Contents