For Installations On The Commonwealth Of Massachusetts; Csd-1 Field Testing Of High Limit Switches - Viessmann B2HA 19 Installation Instructions Manual

Wall-mounted, gas-fired condensing boiler
Table of Contents

Advertisement

Vitodens 200-W B2HA 19, 28, 35 Installation
Important Regulatory and Installation Requirements
For installations on the Commonwealth of Massachusetts, the following modifications to NFPA-54 chapter 10 apply:
Excerpt from 248 CMR 5-08:
2(a) For all side-wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in
whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the
side-wall exhaust vent termination is less than (7) feet above finished grade in the area of the venting, including
but not limited to decks and porches, the following requirements shall be satisfied:
1. INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side-wall horizontal
vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide
detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be
installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired
carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or
structure served by the side-wall horizontal vented gas fueled equipment. It shall be the responsibility of the
property owner to secure the services of qualified licensed professional for the installation of hard-wired carbon
monoxide detectors.
a. In the event that the side-wall horizontally vented gas fueled equipment is installed in a crawl space or an attic,
the hard-wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent
floor level.
b. In the event that the requirements of this subdivision can not be met at the time of completion of installation,
the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however,
that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be
installed.
2. APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with
the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.
3. SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at
a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally
vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2)
inch in size, "GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS".
4. INSPECTION. The state or local gas inspector of the side-wall horizontally vented gas fueled equipment shall not
approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage
installed in accordance with the provisions of 248 CMR 5.08(2)(a) 1 through 4.
(b) EXEMPTIONS: The following equipment is exempt from 248 CMR 5.08(2)(a) 1 through 4:
1. The equipment listed in Chapter 10 entitled "Equipment Not Required To Be Vented" in the most current edition
of NFPA 54 as adopted by the Board; and
2. Product Approved side-wall horizontally vented gas fueled equipment installed in a room or structure separate
from the dwelling, building or structure used in whole or in part for residential purposes.
CSD-1 Field Testing of High Limit Switches for Vitodens boilers – where required by law.
VIESSMANN IS NOT RESPONSIBLE FOR ANY DAMAGES THAT THE FOLLOWING TEST PROCEDURE MAY RESULT
IN BY OVERHEATING THE SYSTEM.
The Vitodens 100/200 boilers are equipped with flow switches or sensors that when activated disable or enable the
burner to operate.
The fixed high limit, when tripped, produces a fault that will require manual reset of the boiler control.
Fixed High Limit fault simulation #1:
-
Close the boiler valve and jumper across the flow switch.
-
Run the boiler at high fire and it will shut down by the coding card (in B2HA models, set coding address 06 to
maximum) but should continue to steady increase the boiler temperature until the fixed high limit is tripped.
-
Once the fixed high limit is tripped, slowly open the boiler valve to safely cool the boiler down.
Fixed High Limit fault simulation #2:
-
Throttle the boiler valve to a point where the burner will run with as little flow as possible.
-
Run the boiler to high fire via relays test.
-
When the burner shuts down on the electronic limit, close the ball valve to stop the flow.
-
The boiler temperature should continue a steady increase to trip the fixed high limit.
-
Once the fixed high limit is tripped, slowly open the boiler valve to safely cool the boiler down.
Fixed High Limit fault simulation #3:
-
Remove one of the wires connected to limit switch, this will produce a fault in the boilers control that requires
manual reset.
General Information
(continued)
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitodens 200-wB2ha 28B2ha 35

Table of Contents