Table of Contents

Advertisement

Available languages

Available languages

FIG-19 Link the control panel connectors
FIG-21 CD player back cover and screws
18. Take down the bag of screws affixed to the CD player back cover; use a cross screwdriver to screw in the CD
player back cover over the CD player. See FIG-21, 21.1
19. Making sure all steps are finished correctly, plug in the power and try using the sauna at first to make sure it will
work properly. Then put the external top board (section 10) over the internal top board, and take out the power plug
through the corresponding hole in the external top board. See FIG-22
FIG-22 Slip the power plug through external top board
21. Take the screws affixed on the external top board, then set up the board using the cross screwdriver. See FIG-23
Installation Completed.

Operation

1. Precautions
e. Check all the circuitry and the plug meet all requirements.
f.
Set the temperature and time to a comfortable level, normally, 60 minutes at 50-65℃(122ºF-140℉)
FIG-20 Link the antenna connectors
FIG-21.1 Fix the CD player back cover with screws
FIG-23 Fix the external board with screws
8
EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mas-i257Mas-i252

Table of Contents