Direct Exhaust - Sidewall - Weil-McLain SlimFit 2 Series Manual

Table of Contents

Advertisement

SlimFit
COMMERCIAL CONDENSING GAS
DIRECT EXHAUST — Sidewall
DIRECT EXHAUST — Sidewall
termination — installation
sequence
adapter at each boiler fitting where stain-
less steel pipe will be connected.
Install the boiler.
Determine the proper location for wall
penetration for each termination.
Prepare wall penetrations before
installing vent piping.
Finish by attaching external pipe and
fittings as shown in the termination
instructions.
Support vertical runs on the outside
of the building with brackets as
shown in the termination instruc-
tions.
Install vent piping from boiler to termi-
nation.
Install a hanger support within
6 inches of any upturn in the piping.
Slope horizontal piping downward
toward the boiler at least 1/4 inch
per foot.
Connect the vent piping at the boiler
per manual instructions.
26
-
FIRED WATER BOILER
Allowable vent pipe materials
1. Use only the materials listed in Figure 13, page 22.
2. Install a bird screen in each vent pipe termination (coupling or elbow).
Bird screens are supplied with the boiler. Cut to size if necessary to fit
vent pipe size used.
Maximum piping length
1. Locate the termination such that the total vent piping from the boiler to
the termination will not exceed the maximum length given in Figure 17.
2. Maximum lengths listed in Figure 17 allow for 2 elbows. Additional
elbows require a reduction in maximum length as explained in the
table notes.
Connecting from termination to boiler
1. Install the terminations as instructed in the following. Then proceed
to page 40 to complete the vent piping between the termination and
the boiler.
SF-550
SF-750
— Install required
*
** For piping using more than 2 elbows, reduce maximum allowable length by 7 feet for
Determine location for sidewall termination
Place the vent terminations using the following guidelines.
1. Terminate the vent piping with a coupling as shown in Figure 16,
page 27. The coupling must butt against the outside wall plate. If vent
piping is extended outside, install a coupling at the outer plate and
continue vent piping from the coupling (or elbow when snorkeling as
in Figure 16, page 27 right side).
a. Apply the configuration on the left side of Figure 16 unless the
b. Apply the configuration on the right side of Figure 16 when the
Boiler Manual Series 2
Maximum piping lengths for DIRECT EXHAUST sidewall
termination
PVC, CPVC, ABS, AL29-4C SS
Feet
Elbows **
30
2
Not allowed
For 4-inch or 6-inch piping, install a pipe reducer directly at the boiler connection,
oriented vertically. Install reducer above the required adapter if using stainless steel
piping.
each additional elbow (90° or 45°). ADD 14 feet to maximum allowable length if the
sidewall termination uses a coupling instead of two elbows.
A gas vent extending through an exterior wall shall not
terminate adjacent to the wall or below building extensions
such as eaves, parapets, balconies or decks, except as otherwise
instructed in this manual or local codes. Failure to comply
could result in severe personal injury, death or substantial
property damage.
termination would fail to meet minimum clearance to grade or
snow line.
termination needs to be raised higher to meet clearance to grade
or snow line.
Feet
Elbows **
Feet
100
2
Not allowed
30
2
100
Part number 550-100-162/0815
Elbows **