To Connect The Pc Configurator To The Outdoor Unit; Commissioning; Precautions When Commissioning; Checklist Before Commissioning - Daikin RXYLQ10T7Y1B Series Installation And Operation Manual

Hide thumbs Also See for RXYLQ10T7Y1B Series:
Table of Contents

Advertisement

[2‑4]
0 (default)
Cooling check operation.
1
Heating and cooling check operation.
2
Heating and cooling check operation.
[2‑8]
T
target temperature during cooling operation.
e
[2‑8]
0 (default)
2
3
4
5
6
7
[2‑9]
T
target temperature during heating operation.
c
[2‑9]
0 (default)
1
3
6
[2‑20]
Manual additional refrigerant charge.
[2‑20]
0 (default)
Deactivated.
1
Activated.
To stop the manual additional refrigerant
charge operation (when the required additional
refrigerant amount is charged), push BS3. If
this function was not aborted by pushing BS3,
the unit will stop its operation after 30 minutes.
If 30 minutes was not sufficient to add the
needed refrigerant amount, the function can be
reactivated by changing the field setting again.
[2‑35]
Height difference setting.
[2‑35]
0
In case the outdoor unit is installed in the
lowest position (indoor units are installed on a
higher position than outdoor units) and the
height difference between the highest indoor
unit and the outdoor unit exceeds 40 m, the
setting [2‑35] should be changed to 0.
1 (default)
[2‑49]
Height difference setting.
[2‑49]
0 (default)
1
In case the outdoor unit is installed in the
highest position (indoor units are installed on a
lower position than outdoor units) and the
height difference between the lowest indoor
unit and the outdoor unit exceeds 50 m, the
setting [2‑49] has to be changed to 1.
[2‑83]
Master user interface allocation in case VRV  DX indoor units and
RA DX indoor units are used at the same time.
RXMLQ8 + RXYLQ10~14T7Y1B*
VRV IV system air conditioner
4P543426-1B – 2020.10
Description
T
target (°C)
e
Auto
6
7
8
9
10
11
T
target (°C)
c
Auto
41
43
46
Description
Description
Description
[2‑83]
0
VRV DX indoor unit has mode selection right.
1 (default)
RA DX indoor unit has mode selection right
setting.
16.1.9
To connect the PC configurator to the
outdoor unit
2
3
4
5
a
PC
b
Cable (EKPCCAB*)
c
Outdoor unit main PCB
17

Commissioning

NOTICE
General
commissioning
commissioning instructions in this chapter, a general
commissioning checklist is also available on the Daikin
Business Portal (authentication required).
The general commissioning checklist is complementary to
the instructions in this chapter and can be used as a
guideline and reporting template during the commissioning
and hand-over to the user.
After installation and once the field settings are defined, the installer
is obliged to verify correct operation. Therefore a test run MUST be
performed according to the procedures described below.
17.1

Precautions when commissioning

CAUTION
Do NOT perform the test operation while working on
the indoor units.
When performing the test operation, NOT only the outdoor
unit, but the connected indoor unit will operate as well.
Working on an indoor unit while performing a test operation
is dangerous.
NOTICE
Be sure to turn ON the power 6 hours before operation in
order to have power running to the crankcase heater and
to protect the compressor.
During test operation, the outdoor unit and the indoor units will start
up. Make sure that the preparations of all indoor units are finished
(field piping, electrical wiring, air purge, ...). See installation manual
of the indoor units for details.
17.2

Checklist before commissioning

After the installation of the unit, first check the items listed below.
Once all checks are fulfilled, the unit must be closed. Power-up the
unit after it is closed.
17 Commissioning
Description
a
c
b
X27A
A1P
checklist.
Next
to
the
Installation and operation manual
33

Advertisement

Table of Contents
loading

Table of Contents