To Connect The Pc Configurator To The Outdoor Unit; 17 Commissioning; Precautions When Commissioning; Checklist Before Commissioning - Daikin VRV IV+ RXYTQ8U5/U7YF Installation And Operation Manual

Heat pump for high ambient temperatures
Table of Contents

Advertisement

(a)
It is necessary to use the optional external control adaptor for
outdoor unit (DTA104A61/62). See the instruction delivered with
the adaptor for further details.
[2‑8]
T
target temperature during cooling operation.
e
[2‑8]
0 (default)
2
3
4
5
6
7
[2‑9]
T
target temperature during heating operation.
c
[2‑9]
0 (default)
1
3
6
[2‑20]
Manual additional refrigerant charge.
[2‑20]
0 (default)
Deactivated.
1
Activated.
To stop the manual additional refrigerant
charge operation (when the required additional
refrigerant amount is charged), push BS3. If
this function was not aborted by pushing BS3,
the unit will stop its operation after 30 minutes.
If 30 minutes was not sufficient to add the
needed refrigerant amount, the function can be
reactivated by changing the field setting again.
16.1.9
To connect the PC configurator to the
outdoor unit
2
3
4
5
a
PC
b
Cable (EKPCCAB*)
c
Outdoor unit main PCB
RXYTQ
VRV IV+ heat pump for high ambient temperatures
4P546223-1C – 2021.11
T
target (°C)
e
Auto
6
7
8
9
10
11
T
target (°C)
c
Auto
41
43
46
Description
a
c
b
X27A
A1P
17
Commissioning
NOTICE
General
commissioning
commissioning instructions in this chapter, a general
commissioning checklist is also available on the Daikin
Business Portal (authentication required).
The general commissioning checklist is complementary to
the instructions in this chapter and can be used as a
guideline and reporting template during the commissioning
and hand-over to the user.
After installation and once the field settings are defined, the installer
is obliged to verify correct operation. Therefore a test run MUST be
performed according to the procedures described below.
17.1

Precautions when commissioning

CAUTION
Do NOT perform the test operation while working on
the indoor units.
When performing the test operation, NOT ONLY the
outdoor unit, but the connected indoor unit will operate as
well. Working on an indoor unit while performing a test
operation is dangerous.
NOTICE
Be sure to turn ON the power 6 hours before operation in
order to have power running to the crankcase heater and
to protect the compressor.
During test operation, the outdoor unit and the indoor units will start
up. Make sure that the preparations of all indoor units are finished
(field piping, electrical wiring, air purge, ...). See installation manual
of the indoor units for details.
17.2

Checklist before commissioning

After the installation of the unit, first check the items listed below.
Once all checks are fulfilled, the unit MUST be closed. Power-up the
unit after it is closed.
You read the complete installation and operation
instructions, as described in the installer and user
reference guide.
Installation
Check that the unit is properly installed, to avoid abnormal
noises and vibrations when starting up the unit.
Field wiring
Be sure that the field wiring has been carried out
according to the instructions described in the chapter
Connecting the electrical wiring, according to the wiring
diagrams and according to the applicable legislation.
Power supply voltage
Check the power supply voltage on the local supply panel.
The voltage MUST correspond to the voltage on the
nameplate of the unit.
Earth wiring
Be sure that the earth wires have been connected
properly and that the earth terminals are tightened.
Insulation test of the main power circuit
Using a megatester for 500  V, check that the insulation
resistance of 2  MΩ or more is attained by applying a
voltage of 500 V DC between power terminals and earth.
NEVER use the megatester for the transmission wiring.