Miller Trailblazer 300D NT Owner's Manual page 35

Table of Contents

Advertisement

C. Making Engine Speed Adjustments
Be sure throttle link
is parallel with
Do not twist
3
solenoid boot
while adjusting
engine speed.
throttle lever.
1
2
4
±
2450
100 rpm
Idle
3750 Max
Weld/Power
6
7
5
Tools Needed:
3/8, 7/16 in
10, 14 mm
.
Before adjusting engine speed, verify
throttle solenoid is installed properly
(see Section B on previous page).
Check engine speeds with a tachometer
(see table). If necessary, adjust speeds as
follows:
Start engine and run until warm. Turn A/V
control to max.
Adjusting Idle Speed
Turn Engine Control switch to Run/Idle
position.
1
Throttle Solenoid
2
Idle Speed Jam Nut
3
Plunger
4
Throttle Link
5
Throttle Lever
Loosen jam nut. While holding throttle link
with a 3/8 in wrench, turn plunger clock-
wise to increase idle speed or counter-
clockwise to decrease idle speed.
.
After adjusting idle speed, verify the
throttle link is parallel with the throttle
lever. If necessary, loosen the idle
speed jam nut and reposition the
throttle link.
.
Do not twist solenoid boot while ad-
justing engine speed.
Tighten jam nut.
Adjusting Weld/Power Speed
Start engine and run until warm. Turn A/V
control to max.
6
Weld Speed Jam Nut
7
Adjustment Screw
Turn Engine Control switch to Run posi-
tion. Loosen nut and turn screw counter-
clockwise to increase speed. Turn screw
clockwise to decrease speed. Tighten nut.
Ref. ST-801 961 / ST-801 963
OM-487 Page 31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents