Cisco 809 Hardware Installation Manual page 41

Industrial integrated services router
Hide thumbs Also See for 809:
Table of Contents

Advertisement

Installing the Router
Step 6
Use a ratcheting torque screwdriver to tighten the ground screw and ring terminal to the router side panel to 3.5 in-lb (0.4
N-m). The torque should not exceed 3.5 in-lb (0.4 N-m).
Step 7
Attach the other end of the ground wire(#1 in the graphic above) to a grounded bare metal surface, such as a ground bus,
a grounded DIN rail, or a grounded bare rack.
Cisco 809 Industrial Integrated Services Router Hardware Installation Guide
Installing the Router Ground Connection
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ir809g-lte-la-k9

Table of Contents