Downflow Installation - Payne PG80ESAA Installation, Start-Up, Operating And Service And Maintenance Instructions

Single--stage, 4--way multipoise 33--1/3 in. non--condensing gas furnace input capacities 45,000 thru 155,000 btuh
Table of Contents

Advertisement

38 mm) (max) corrosion- -resistant machine bolts, washers and
nuts.
NOTE: Bottom closure must be used when leveling legs are
used. It may be necessary to remove and reinstall bottom closure
panel to install leveling legs. To remove bottom closure panel, see
Item 1. in Bottom Return Air Inlet section.
To install leveling legs:
1. Position furnace on its back. Locate and drill a hole in
each bottom corner of furnace. (See Fig. 10.)
2. For each leg, install nut on bolt and then install bolt and
nut in hole. (Install flat washer if desired.)
3. Install another nut on other side of furnace base. (Install
flat washer if desired.)
5/ 16
(8mm)
1
3
/
4
(44mm)
(8mm)
5
/
16
(44mm)
1
3/ 4
1
3/ 4
(44mm)
Fig. 10 - - Leveling Legs
4. Adjust outside nut to provide desired height, and tighten
inside nut to secure arrangement.
5. Reinstall bottom closure panel if removed.

DOWNFLOW INSTALLATION

NOTE: For downflow applications, this furnace is approved for
use on combustible flooring when any one of the following 3
accessories are used:
S
Special Base, KGASB
S
Cased Coil Assembly Part No. CNPV, CNRV, CAP, or
CAR
S
Coil Box Part No. KCAKC
1. Determine application being installed from Table 4.
2. Construct hole in floor per Table 4 and Fig. 11.
3. Construct plenum to dimensions specified in Table 4 and
Fig. 11.
4. If downflow subbase KGASB is used, install as shown in
Fig. 12. If Coil Assembly Part No. CNPV, CNRV, CAP
and CNR or Coil Box Part No. KCAKC is used, install as
shown in Fig. 13.
NOTE: It is required that the perforated supply- -air duct flanges
be completely folded over or removed from furnace when
installing the furnace on a factory- -supplied cased coil or coil box.
To remove the supply- -air duct flange, use wide duct pliers or
hand seamers to bend flange back and forth until it breaks off. Be
careful of sharp edges. (See Fig. 14.)
(8mm)
5/ 16
1
3
/
4
(44mm)
(8mm)
5/ 16
Bottom Return Air Inlet
These furnaces are shipped with bottom closure panel installed in
bottom return- -air opening. Remove and discard this panel when
bottom return air is used. To remove bottom closure panel,
perform the following:
1. Tilt or raise furnace and remove two screws holding bot-
tom filler panel. (See Fig. 9.)
2. Rotate bottom filler panel downward to release holding
tabs.
3. Remove bottom closure panel.
4. Reinstall bottom filler panel and screws
Fig. 11 - - Floor and Plenum Opening Dimensions
A89014
Fig. 12 - - Furnace, Plenum, and Subbase Installed
10
A
PLENUM
OPENING
B
D
FLOOR
OPENING
C
FURNACE
(OR COIL CASING
WHEN USED)
COMBUSTIBLE
FLOORING
DOWNFLOW
SUBBASE
SHEET METAL
PLENUM
FLOOR
OPENING
on a Combustible Floor
A96283
A96285

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pg80esla

Table of Contents