12
Decommissioning
12
Decommissioning
58
Assure Heat
12.1 Decommissioning Procedure
1. Isolate the gas & electric supplies and disconnect them.
2. Drain the primary circuit and disconnect the filling device.
3. Dismantle the chimney system and remove the boiler from the
wall mounting frame.
7684200-01 (06/17)