Sealed Systems Details - Potterton Assure Heat 13 Installation And Service Manual

Condensing central heating boiler
Hide thumbs Also See for Assure Heat 13:
Table of Contents

Advertisement

3 Litre Top Up Bottle
(if required)
Air
Vent
Radiator
Circuit
Max Boiler Flow
Temp = 82° C
Fig. 7
Method of determining minimum valve of
expansion vessel volume for sealed
systems using Baxi Boilers
Static
Vessel
Head
Charge
( m)
Pressure
(Bar)
<5
0.5
<10
1.0
<15
1.5
Example :-
System Volume = 75 litres
Vessel Charge Pressure = 1.0 bar
Table. 1a
Initial System Pressure = 1.5 bar
Then :-
75 x 0.152 = 11.4 litres
Expansion Vessel Volume
Where a vessel of the calculated size is not obtainable
then the next available larger size should be used.
CH
Stop
Return
Valve
Temporary
Hose
Fig. 8
7684200-01 (06/17)
Filling
Pressure
Point
Gauge
Safety
Pump
Expansion
Vessel
Boiler
System Drains
at Low Point
Initial
Multiply Total
System
Water Content
Pressure
Of System By
(Bar)
(Litres)
0.5
0.067
1.0
0.112
1.5
0.207
2.0
0.441
1.0
0.087
1.5
0.152
2.0
0.330
1.5
0.125
2.0
0.265
nOTE
Double
Check
Stop
Valve
Valve
5.2.9

Sealed Systems Details

1. SAFETY VALVE - A safety valve complying with the
requirements of BS EN ISO 4126-1 must be fitted close to the
boiler on the flow pipe by means of a horizontal or vertically
upward connection with no intervening valve or restrictions and
should be positioned to facilitate testing. The valve should be
Valve
pre-set and non-adjustable to operate at a pressure of 3 bar. It
must be arranged to discharge any water or steam through a
pipe to a safe outlet position.
2. PRESSURE gAUgE - A pressure gauge of minimum range
0-4 bar with a fill pressure indicator must be fitted to the
system, preferably at the same point as the expansion vessel in
an easily visible position.
3. EXPAnSiOn VESSEL - An expansion vessel complying with
the requirements of BS EN 13831 must be fitted to the system
by means of a connection close to the inlet side of the
circulating pump in accordance with the manufacturers
instructions, the connecting pipe being unrestricted and not
less than 15mm nominal size. The volume of the vessel should
be suitable for the system water content and the nitrogen or air
charge pressure should not be less than the system static head
(See Table. 1a).
Further details of sealed system design can be
obtained from BS EN 12828, 12831 & 14336 and the British
Gas publication entitled 'Specifications for Domestic Wet
Central Heating Systems'.
4. FiLLing POinT - A filling point connection on the central
heating return pipework must be provided to facilitate initial
filling and pressurising and also any subsequent water loss
replacement / refilling. The sealed primary circuits may be filled
or replenished by means of a temporary connection between
the primary circuit and a supply pipe provided a 'Listed' double
check valve or some other no less effective backflow
prevention device is permanently connected at the inlet to the
circuit and the temporary connection is removed after use. The
filling method adopted must be in accordance with all relevant
water supply regulations and use approved equipment.
Your attention is drawn to, for GB: Guidance G24.2 and
recommendation R24.2 of the Water Regulations Guide. for IE:
the current edition of I.S. 813 "Domestic Gas Installations".
5. MAKE UP SYSTEM - A method of replacing water lost from
the system should be provided either by means of a make up
vessel of not more than 3 litres capacity, mounted above the
highest point of the system, or by re-pressurisation of the
Mains
Cold
system.
Supply
6. VEnTing - A method of venting the system during filling and
commissioning is provided by an automatic air vent fitted inside
the boiler. The air vent is supplied in the open position.
7. HOT WATER STORAgE - The hot water storage vessel
must be of the indirect coil type. All components used in the
system must be suitable for operation at 110°C and at the
pressure allowed by the safety valve.
Before Installation
5
Assure Heat
25

Advertisement

Table of Contents
loading

Table of Contents