en | Planning
1
3
F
A
Air-return pipe
The open end of the air-return pipe is sloped at an angle of 45°.
The distance of the air sampling openings to one another and to the duct wall is represented
in the following table.
Bore distances
Diameter of the air sampling openings
The diameter of the air sampling openings is derived from the number of air sampling
openings. The precise value can be obtained from Simplified pipe planning.
The pipe is closed with an end cap without bore hole.
Arrangement
The air sampling openings must face the airflow.
Note when planning that the air-conditioning ducts are often only accessible from two sides
for installation of the pipe system.
Example
The figure below shows two planning examples of pipe systems in air-conditioning ducts.
2020.04 | 5.1 | F.01U.088.878
2
FAS / FCS
5
4
3
2
A
FAS / FCS
Distance of the air sampling openings
to the wall
Distance of the air sampling openings
to one another
2
1/2 b
5
1
v
4
v
3
v
2
B
v
1
Operation guide
Aspiration smoke detector LSN improved
F
Front view
A
Plan view
1
Air-conditioning duct
2
Duct adapter
b
3
Airflow
4
Aspiration
5
Air-return pipe
b
Width of air-conditioning
duct
v
 - v
Flow speed
1
4
Duct cross-
Duct cross-
section ≤ 0.5 m²
section > 0.5 m²
100 to 200 mm
200 to 300 mm
100 mm
150 mm