Vent Termination; Direct Vent, Two Pipe Roof And Sidewall Vent Terminations - Westinghouse WGRT 150 Series Installation Start-Up Maintenance Parts

Residentialtankless water heater
Table of Contents

Advertisement

25
E. VENT TERMINATION

1. Direct Vent, Two Pipe Roof and Sidewall Vent Terminations

Figure 10 – Direct Vent, Roof and Sidewall Vent Terminations
All vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of ¼" per foot back to the appliance to
allow drainage of condensate. When placing support brackets on vent piping, the first bracket must be within 1 foot of the appliance and
the balance at 4 foot intervals on the vent pipe. Appliance venting must be readily accessible for visual inspection for the first three feet
from the appliance.
WHL-004 REV. 5.26.17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wgrt 199 series

Table of Contents