Checkout
Procedure
1. Shut off the gas at the main manual shutoff valve and open the
2. Connect air tubing with a maximum pressure of 1-1/2 times the
3. Paint the pipe connections and flanges of the valve with a rich soap
4. Open the main manual shutoff valve.
5. Refer to the Adjustments section to make any necessary valve setting
6. Before leaving the installation, observe at least three complete
8 G—UL Listed GS-20/25 and GS-40/45 Series Single-block Multi-function Gas Control Valves Technical Bulletin
All manuals and user guides at all-guides.com
!
WARNING: Fire or explosion hazard. Verify that the valve
functions properly and there are no gas leaks. Follow
this checkout procedure before leaving the
installation. Failure to verify proper valve installation,
equipment operation, and gas tight connections may
result in fire, explosion, property damage, and injuries
or death.
pressure connection between the manual shutoff valve and the GS
valve.
valve's maximum operating pressure (as indicated on the valve) to the
opened pressure connection.
and water solution to check for leakage.
If bubbles occur, this is an indication of a leak. To stop a leak, tighten
joints and pipe connections. Replace the part if the leak cannot be
stopped.
If bubbles do not occur, remove the air tubing and close the upstream
pressure connection.
adjustments.
!
WARNING: Fire or explosion hazard. Valve settings must be in
accordance with the appliance or equipment
manufacturer's specifications.
operating cycles to ensure that all components are functioning
correctly.