Connecting The Cooling Tube To The Fl Ame Inspection Window; Assembling The Panels, Mod. Prextherm Rsh 500N÷800N - Ferroli PREXTHERM RSH 100N Instruction For Use, Installation And Assembly

High-efficiency boiler for liquid or gas fuels
Hide thumbs Also See for PREXTHERM RSH 100N:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 30
The fuel connections to the burner must be placed so that the boiler door can open
completely with the burner installed.
It is advisable to place a rigid supporting base under the burner to prevent its full
weight from negatively affecting the door.
Models
L min. (mm)
92N-152N
230
190N-401N
250
525N-600N
250
720N-1060N
320
5.8 Connecting the cooling tube to the fl ame inspection window
The flame inspection window is equipped with a pressure fitting (1).
Once the interior screw is loosened, it must be connected to outlet 2 on
the burner using a silicone hose or copper pipe. This allows the air
blown back by the fan to cool the glass on the window and prevent it
from turning black. Failure to connect the hose or pipe to the window
can cause the glass to break.
When disassembling the window for cleaning, check the condition of
the seals, replacing them if necessary. After closing, verify tightness.
5.9 Assembling the panels, mod. PREXTHERM RSH 500N÷800N
a) Carefully position the side panels (pos. 1, 2 - 3 and 4), hooking them
onto the supports on the boiler.
b) Assemble the U (pos. 12).
c) Attach the control panel to the top front panel (pos. 5).
d) Rest the top panel (pos. 5), which includes the control panel, against
the side panel (pos. 1), which includes springs, closing pins and nuts
(pos. 9-10-11).
e) Insert the instrument bulbs in the sheaths (pos. 13) and make the
electrical connection from the control panel to the mains, burner, any
pumps, etc. It is advisable to insert the probes fully into the sheaths to improve contact. Then secure the capillary tubes with the springs.
Close the cover on the electrical panel and pass the burner plug through the openings on the previous plate (pos. 14).
f) Install the top panels (pos. 6-7-8), hooking them onto the side panels (pos. 2-3-4), which include springs, closing pins and nuts (pos.
9-10-11).
38
EN
L max. (mm)
S
300
-
320
-
360.
-
390
239
7
4
3
PREXTHERM RSH N
8
6
5
13
12
1
14
fi g.13
fi g.11
fi g.12
10
11
9
2
A73020821

Advertisement

Table of Contents
loading

Table of Contents