Preparing The System For Operation - IBM 9009-22A Manual

Drive backplanes
Hide thumbs Also See for 9009-22A:
Table of Contents

Advertisement

Figure 76. Reconnecting the signal cable and the power cable
3. Replace the air baffles. For instructions, see Replacing the air baffle (www.ibm.com/support/
knowledgecenter/POWER9/p9haj/p9haj_922_airbafflereplace.htm).
Preparing the 5105-22E, 9008-22L, 9009-22A, 9009-22G, 9223-22H, or 9223-22S
system for operation after removing and replacing the drive backplane signal cable
To prepare the system for operation after removing and replacing a drive backplane signal cable,
complete the steps in this procedure.
Procedure
1. Slide the service access cover (A) onto the system unit.
2. Close the release latch (B) by pushing it in the direction shown.
88 Power Systems: Power Systems: Drive backplane