Download Print this page

HP ProBook 650 G1 Product End-Of-Life Disassembly Instructions page 54

Hide thumbs Also See for ProBook 650 G1:

Advertisement

Document No. Cyclone 15B FA DIS ASS'Y SOP
Name
:
Recycle TPCB
2 key
2 key
4 key
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Tabulator:
Alicia Chien
Standard Operation Procedure
Fig.1
Fig.2
Fig.3
Qty
Auditor : Stanley Chen
Ver. :
Step:
1. Recycle TPCB.
2 KEY – Fig.1 / Fig.2
4 KEY – Fig.3 / Fig.4
4 key
Holding fixture list (holding fixture standard)
Issue department:
Station :
2013/08/23
0.1
Date
:
Fig.4
NPSU-PPE
34(1/1)
Qty

Advertisement

loading