Siemens SIMATIC NET SCALANCE X-300M Compact Operating Instructions page 35

Industrial ethernet switches
Hide thumbs Also See for SIMATIC NET SCALANCE X-300M:
Table of Contents

Advertisement

Installation
Install the IE Switch X-300 on a 35 mm DIN rail complying with DIN EN 60715.
1. Hang the IE Switch X‑300 on the DIN rail and then push it in against the rail until it clips into
place.
2. Fit the connectors for the power supply.
3. Fit the connectors for the signaling contact.
4. Insert the terminal blocks into the sockets on the IE Switch X-300.
Figure 5-1
Removing
To remove an IE Switch  X‑300 from the DIN rail:
1. Disconnect all cables from the switch.
2. Release the lower part of the IE Switch X‑300 from the DIN rail with a screwdriver and pull the
lower part of the switch away from the DIN rail.
Figure 5-2
Removing an IE Switch X‑300
1. Push the X‑300 down.
2. Swing the device upwards.
SCALANCE X-300M
Compact Operating Instructions, 05/2023, A5E02630801-14
Mounting an IE Switch X-300 on a DIN rail (35 mm)
Removing an IE Switch X-300 from a DIN rail (35 mm)
Installation and disassembly
5.5 General installation
35

Advertisement

Table of Contents
loading

Table of Contents